BusinessWorks Managed Fault Tolerance Active/Passive AppNode Activation Time

Hi,

We have installed a BusinessWorks 6.3.4 cluster environment with 2 physical machines and ems-datastore group provider for  the engine. We have an appspace configured with 2 appnodes related with bwagents on different machines. This is a successfully working configuration for managed fault tolerance.

We have tested the managed ft functionality with a simple rest application configured as single appnode activation. In this way, one of the appnodes became active accepting requests and the other has the application deployed but waiting in passive mode. After killing process of the active appnode on operating system level, it took 60 seconds to activate application on passive appnode.

Are there any ways to reduce the waiting interval for appnode activation? In what configuration we can determine the activation interval for appnodes?

King Regards,

Ozgen

(3) Answers

Login